Canteen extension building works for a Premier League football club .

To complete the extension we were required to work confidentially and professionally at the high profile, sensitive site.

Project Introduction.

Aspire Construction was approached by an existing client for building works at a Premier League football club’s first team canteen facilities.

Premier League Football Club 01

Project Brief.

The client wanted to extend the chef preparation area of the existing first team canteen. The extension was to be installed on the flat roof of an existing building.

To complete the extension we were required to work confidentially and professionally at the high profile, sensitive site. We needed to replace cladding and install steel frames, Metsec studs and a metal deck. We were also required to complete preparation works to the roof of the existing building on top of which the new extension would be constructed.

The specified cladding was on a long lead time so early engagement of our services was required.

Development.

Before beginning construction, we erected scaffolding for safe access.

The preparation for the extension then began with the removal of the existing stone ballast, which we stored for reuse. The flat roof coverings were removed to the footprint of the new extension, after which we quickly assembled robust temporary waterproofing to protect the existing roof from poor weather conditions while the development progressed. We then removed the existing cladding to the adjacent buildings.

With the preparation complete, we connected a steel frame structure to the existing building. A Metsec system of galvanised steel stud panels was installed to provide support for insulation, exterior cladding and interior boarding. We were then able to install the external cladding boards, insulation, cladding rails and interior cladding panels.

For the roof, metal roof decking was required to support the insulating membrane, over which we installed roof coverings. We then lapped the roof coverings at roof level into the existing building.

Premier League Football Club 01

Outcome.

The project took 10 weeks to complete.

Ensuring that the existing building remained watertight during the works was a key challenge which we were able to achieve due to our extensive experience on similar projects.

Tying all the separate design elements together required our problem-solving expertise and experience in working on a diverse range of building works. We were able to bring the project together and work cohesively throughout to meet the brief.

We undertook this project for an existing client who trusted the Aspire Construction team to work sensitively and professionally at a high profile site, maintaining confidentiality throughout.

The client was delighted with the results and we hope to work with them on other high profile projects in the future.

Civil Engineering & Construction Services.

To find out how Aspire Construction services can benefit both construction and civils/groundworks projects contact us on 0161 639 0999 or email projects@aspireconstruction.co.uk.

Our Projects.

We are proud to have worked on a range of projects across the UK, including schools, commercial and hospitality venues, residential developments, industrial sites, and many more. View a selection of them by clicking the button below.

View our Projects

Our services.

Whether you need a specialist service such as site clearance, drainage, demolition, refurbishment or associated building works; or you require construction management to oversee your project and bring together contractor services, Aspire Construction will achieve project success for you.

View our Services